Construction of approximately 1,700 linear feet of concrete sidewalk and curb along Carman Drive, including four concrete curb ramps and the reconstruction of nine driveways. In addition, the project includes a new large flow-through stormwater planter and seven streetlights with poles. Another major component is a 100-foot-long retaining wall up to six feet tall. The work also includes tree removal, relocation of water meters, underground utilities, and the addition of a new catch basin and storm pipe.

 