Project Bid Deadline
12/19/2025
Contact Email
Link / Website
Description
Construction of approximately 1,700 linear feet of concrete sidewalk and curb along Carman Drive, including four concrete curb ramps and the reconstruction of nine driveways. In addition, the project includes a new large flow-through stormwater planter and seven streetlights with poles. Another major component is a 100-foot-long retaining wall up to six feet tall. The work also includes tree removal, relocation of water meters, underground utilities, and the addition of a new catch basin and storm pipe.
Marketing Material
