Event Date / Project Bid Deadline

11/23/2026

 

Contact Email

 

Description

•Project Description: OHSU seeks a jointly proposed AE and CMGC team to plan, design, engineer, estimate, construct and support commissioning and closeout of a new BSL-3 / ABSL-3 facility on the seventh floor of Richard Jones Hall (RJH), with associated rooftop mechanical penthouse and infrastructure work. The project is approximately 5,162 square feet of research and research-support space, expanded in-vitro laboratory capacity, and ABSL-3 capacity. The existing sixth-floor BSL-3 facility is to remain operational during construction and commissioning of the new space.

•Purpose: The purpose of this RFP is to select one coordinated, self-assembled AE/CMGC team with demonstrated high-containment laboratory and NIH-funded construction experience. The intended delivery method is Construction Manager-at-Risk / CMGC, with one joint proposal and separate direct agreements between OHSU and the AE and between OHSU and the CMGC.

•The new facility will replace the existing Main Campus BSL-3 facility and add ABSL-3 capability. The procurement scope, space accounting, and funding allocation shall be the OHSU and NIH-approved program identified in Attachment A-3. The penthouse area and any work outside the grant-supported space shall be identified separately in the approved program and budget.

•The AE shall retain responsibility for its professional design services under its agreement with OHSU. The CMGC shall retain responsibility for preconstruction services and, when authorized, construction under its agreement with OHSU. A joint proposal does not transfer the AE’s design responsibility to the CMGC or create a single design-build obligation. Both firms shall comply with the common project coordination requirements.

•The prime AE and CMGC shall pair before proposal submission and identify one proposal coordinator. Both firms must be identified as prospective contracting parties and must sign the joint response. OHSU intends to select the proposed pairing; replacement of either prime firm or key personnel is subject to OHSU review and written approval

 

 

Marketing Material

Architectural-Engineering_Construction Manager-General Contractor Joint Venture RFP-2027-0014_NAMC