Be a bridge to change. Become a NAMC-Oregon Member Today!

Event Date / Project Bid Deadline

5/1/2026

 

Contact Email

bids@bremik.com

 

Description

Project Description:

The Whitmarsh Apartments Renovation consists of a renovation to a historic building in downtown Portland. The works consists of removal and replacement of a structural sidewalk lid, consisting of new structural steel and concrete, full removal and replacement of the existing roof membrane, structural strengthening of the roof structure and URM parapet walls, new rooftop PV systems and HVAC units, and removal and replacement of existing lightwell windows and roofing. New sidewalk area will have a final coat of traffic coating applied to it as well.

Scopes of Work Available to Bid:

  • Division 02: Structural and Soft Demolition
  • Division 03: Cast-in-Place Concrete & Reinforcing
  • Division 05: Structural Steel Framing & Steel Decking
  • Division 06: Rough Carpentry Framing, Finish Carpentry, & Architectural Casework
  • Division 07: Thermal Insulation, Traffic Coating Systems, TPO and SBS Roofing, Sheet Metal Flashing & Trim, Roof Accessories
  • Division 08: Hollow Metal Doors & Frames, Wood Doors, & Hardware, Vinyl Windows
  • Division 09: Metal Stud Framing, Gypsum Assemblies, Resilient Flooring & Base, Carpet Flooring, Interior & Exterior Painting
  • Division 21: Fire Suppression Systems
  • Division 32: Earthwork, Asphalt Paving, Site Concrete

Milestone Dates:

  • Job Walk 04/22/2026 at 10:00 AM
  • Project Open House Event 04/24/2026 at 10:00 AM
  • Bremik Construction Main Offices, 1026 SE Stark St. Portland, OR 97214
  • Deadline for Bidder Questions 04/27/2026 at 2:00 PM
  • Bids Due 05/01/2026 at 2:00 PM
  • Notices of Intent to Award 05/11/2026
  • Start of Construction 07/06/2026
  • Substantial Completion 12/04/2026

Available Project Information:

The following project documents can be found at www.bremik.com/planroom

  • Plans: Bid Set Drawings Dated 04.15.2026
  • Specifications: Bid Set Specifications Dated 04.15.2026
  • Hazardous Material Assessment: Dated 04.15.2026

Contracting Requirements:

  • Wage Requirements BOLI Commercial Prevailing Wages
  • Project Equity Goals 30% DMWESB Firm Participation
  • Apprentice Participation & Workforce Training Yes,
  • Apprenticeship Participation and Tracking will be required as part of this project
  • Sustainable Building Standards None
  • OCIP/CCIP Requirements None
  • Build America By America Building Material Requirements
  • Lumber, Iron & Steel Products, Non Ferrous Metals, Plastic/Polymer Building Materials

How to Submit Pre-Bid Questions:

All questions or substitution requests must be directed to Bremik Construction. Do not contact the architect, owner, or any design consultants directly. Any correspondence not submitted through Bremik Construction will not be answered.

  • Send all questions to Dexter Parry, Project Manager (dp@Bremik.com) & Bids@Bremik.com

How to Submit a Bid:

Review all provided bid materials. Fill out the Bid Form provided and attach it to your proposal on company letterhead with your bid, clarifications, assumptions and exclusions, and combine into a single .PDF packet.