Be a bridge to change. Become a NAMC-Oregon Member Today!

Event Date / Project Bid Deadline

4/27/2026

 

Contact Email

maize@faisonconstruction.com

 

Link / Website

https://www.dropbox.com/scl/fo/eif7bpslaj3xu991u5cyh/ACL4PrcIl7vflTYbI3LTHaI?rlkey=g34e7i9sdf6ftz7cpges6q63c&st=qtbozmkh&dl=0

 

Description

The work consists of constructing approximately 877 linear feet of asphalt paved trail, construction of approximately 516 linear feet (approx. 1697 Face Feet) of retaining wall, construction of approximately 734 linear feet of handrail, construction of approximately 690 linear feet of 6’ black vinyl chain link fence, construction of approximately 202 linear feet of 5’ galvanized chain link fence, installation of French drain along pathway, tree removal, and landscaping. Landscaping work will include native tree and shrub plantings and native restoration seed mix adjacent to the trail, the installation of a temporary irrigation system, and some native sapling planting on a nearby site.

 

Marketing Material

GreenwayTrail_ITB.pdf

Highway, street, and bridge construction: installation of bridge and guard rails; highway concrete flat work; Residential and commercial contracting for poured concrete foundation and structure, painting and wall covering, finish carpentry, fencing construction
https://www.faisonconstruction.com/